Construction of a new Multi-Sport Athletic Field.
- 1,995 LF – Compost Filter Sock
- 1,235 LF – 6’ Fence Removal
- 9,066 CY – Strip Topsoil
- 8,396 CY – Bulk Cut
- 2,920 CY – Excavation for Underground SWM System
- 3,390 LF – 18” Perforated SLCPP
- 2,695 CY – OGA Backfill (AASHTO #57)
- 2,507 LF – Storm Pipe
- 4 EA – Type M Inlets
- 14 EA – Storm Manhole
- 1,865 LF – 6” X 12” Concrete Curb
- 17,335 SY – 8 OZ Geotextile
- 1 Pair – Football Goal Posts
- 3,851 CY – 2 Layer Synthetic Turf Drainage Base
- 155,985 SF – Laser Grade Finish Stone
- 3,390 SY – Asphalt Paving
- 1 LS – Segmental Retaining Wall
- 15,385 SY – Spread Topsoil, Seeding, and Matting