Removal of existing grass field and construction of a new synthetic turf field.
- 1,100 LF – Compost Filter Sock
- 4,940 CY – Strip Topsoil
- 990 CY- Bulk Cut
- 950 CY – Excavation for Underground SWM System
- 1,520 CY – OGA Backfill (AASHTO #57)
- 1,955 LF – Storm Pipe
- 5 EA – Type M Inlets
- 1 EA – Storm Manhole
- 1,302 LF – 6” X 12” Concrete Curb
- 1,260 LF – Panel Drain
- 10,450 SY – 4 OZ Geotextile
- 1 Pair – Football Goal Posts
- 1,745 CY – 2 Layer Synthetic Turf Drainage Base
- 94,050 SF – Laser Grade Finish Stone
- 440 SY – D Area Concrete Paving
- 1,650 SY – Spread Topsoil, Seeding, and Matting