Total reconstruction of the condemned stadium referred to as the Pit and transformed into what is now named Heinze Field.
- 2,362 LF – Compost Filter Sock
- 1 LS – Clearing & Grubbing
- 1,260 LF – Strip Topsoil
- 3,826 CY – Excavation
- 1,600 LF – Storm Pipe
- 1,040 LF – 8” X 12” Concrete Curb
- 1,860 LF – 4” Perforated Field Drain
- 6,400 SY – 4 OZ Geotextile
- 2,147 CY – 2 Layer Synthetic Turf Drainage Base
- 57,600 SF – Laser Grade Finish Stone
- 1 Pair – Football Goal Posts
- 890 LF – Vinyl Coated Chain Link Fence
- 145 SY – HMA ADA Parking
- 1,349 SY – HMA Walkway Paving