Project involves construction of a new 17 lot subdivision for Arbutus Park Manor.
- 1,715 CY – Topsoil Stripping
- 8,415 CY – Excavation
- 1,380 LF – Storm Pipe
- 17 EA – Type M Inlets
- 991 LF – 8” Sanitary Sewer
- 6 EA – Sanitary Manholes
- 1,370 LF – 6” Waterline
- 1 EA – Water Meter Vault
- 1,390 LF – Pavement Base Drain
- 1,500 LF – Mountable Concrete Curb Gutter
- 1 LS – Asphalt Paving
- 1 LS – Topsoil, Seeding, and Mulching