Construction of a new multi-Purpose athletic facility with synthetic turf.
- 1,260 LF – Compost Filter Sock
- 4,750 CY – Bulk Excavation
- 1,542 SF – Segmental Retaining Wall
- 1,890 CY – Excavation for underground SWM System
- 1,890 CY – OGA Backfill (AASHTO #57)
- 560 LF – Storm Pipe
- 1 EA – Type M Inlets
- 1 EA – Storm Manholes
- 1,040 LF – 12” X 12” Cement Concrete Curb
- 1,080 LF – 12” Perforated Underdrain
- 1,470 LF – Vinyl Coated Fence
- 12,374 SY – 4 OZ Geotextile
- 3,170 SY – 8” 2 Layer Synthetic Turf Drainage Base
- 111,364 SF – Laser Grade Finish Stone
- 940 SY – Cement Concrete Walkway
- 2,265 SY – HMA Paved Parking Lot
- 150 SY – HMA Walkway Paving
- 240 LF – 20-High Pole Netting System
- 71 LF – 30-High Baseball Backstop Tension Netting System