Blue Mountain School District

BLUE MOUNTAIN SCHOOL DISTRICT SCHUYLKILL HAVEN, PA.

Project consisted of construction of a complete new synthetic turf field at the stadium without damaging the existing track and construction of a synthetic turf baseball infield.

STADIUM

  • 1,300 LF – Compost Filter Sock
  • 225 SY – Construction Entrance
  • 1,830 CY – Topsoil Removal
  • 1,770 CY – Bulk Excavation
  • 4,552 CY – Excavation for underground SWM System
  • 4,552 CY – OGA Backfill (AASHTO #57)
  • 1,945 LF – Storm Pipe
  • 1,295 LF – 6” X 12” Cement Concrete Curb
  • 1,725 CY – 2 Layer Synthetic Turf Drainage Base
  • 93,500 SY – Laser Grade Finish Stone
  • 436 SY – D Area Asphalt Pavement

 

BASEBALL FIELD

  • 700 LF – Compost Filter Sock
  • 530 CY – Infield Mix Removal
  • 310 CY – Bulk Excavation
  • 556 CY – Excavation for underground SWM System
  • 556 CY – OGA Backfill (AASHTO #57)
  • 910 LF – Storm Pipe
  • 570 LF – Cement Concrete Curb          
  • 520 CY – 2 Layer Synthetic Turf Drainage Base
  • 28,120 SY – Laser Grade Finish Stone
  • 290 SY – Sod Transition

 

 