Project consisted of construction of a complete new synthetic turf field at the stadium without damaging the existing track and construction of a synthetic turf baseball infield.
STADIUM
- 1,300 LF – Compost Filter Sock
- 225 SY – Construction Entrance
- 1,830 CY – Topsoil Removal
- 1,770 CY – Bulk Excavation
- 4,552 CY – Excavation for underground SWM System
- 4,552 CY – OGA Backfill (AASHTO #57)
- 1,945 LF – Storm Pipe
- 1,295 LF – 6” X 12” Cement Concrete Curb
- 1,725 CY – 2 Layer Synthetic Turf Drainage Base
- 93,500 SY – Laser Grade Finish Stone
- 436 SY – D Area Asphalt Pavement
BASEBALL FIELD
- 700 LF – Compost Filter Sock
- 530 CY – Infield Mix Removal
- 310 CY – Bulk Excavation
- 556 CY – Excavation for underground SWM System
- 556 CY – OGA Backfill (AASHTO #57)
- 910 LF – Storm Pipe
- 570 LF – Cement Concrete Curb
- 520 CY – 2 Layer Synthetic Turf Drainage Base
- 28,120 SY – Laser Grade Finish Stone
- 290 SY – Sod Transition