Installation of utilities and storm water detention for the Windy Ridge Corporate Park.
- 4,720 LF – 8” Sanitary Sewer
- 19 EA – Sanitary Manholes
- 5,000 LF – Conduit Duct Bank
- 18,665 CY – Excavation
- 391 CY – Stone Lining
- 718 CY – Rip Rap