Project consisted of the transformation of a grass baseball and softball field to a reconstructed complete synthetic turf field.
BASEBALL FIELD
- 615 LF – Silt Fence
- 2,136 CY – Infield Mix and Topsoil Removal
- 2,750 CY – Bulk Excavation
- 767 LF – Storm Pipe
- 1 EA – Storm Pipe Detention System
- 1,212 LF – 12” X 12” Cement Concrete Turf Curb
- 1,141 LF – 8” Perforated SLCPP Underdrain Collector
- 4,470 LF – 1” X 12” Flat Panel Drain
- 2,150 CY – 2 Layer Synthetic Turf Drainage Base
- 115,830 SF – Laser Grade Finish Stone
SOFTBALL FIELD
- 460 LF – Silt Fence
- 702 CY – Infield Mix and Topsoil Removal
- 2,990 CY – Bulk Excavation
- 540 LF – Storm Pipe
- 1 EA – Storm Pipe Detention System
- 702 LF – 12” X 12” Cement Concrete Turf Curb
- 745 LF – 10” Perforated SLCPP Underdrain Collector
- 740 LF – 1” X 12” Flat Panel Drain
- 715 CY – 2 Layer Synthetic Turf Drainage Base
- 38,240 SF – Laser Grade Finish Stone