Central Cambria School District

CENTRAL CAMBRIA SCHOOL DISTRICT NEW MULTI-PURPOSE FIELD , EBENSBURG, PA.

Construction of a new multi-Purpose athletic facility with synthetic turf.

  • 1,360 LF – Compost Filter Sock
  • 3,880 CY – Topsoil Removal
  • 16,300 CY – Bulk Excavation
  • 1,100 SF – Segmental Retaining Wall
  • 1,890 CY – Excavation for underground SWM System
  • 1,890 CY – OGA Backfill (AASHTO #57)
  • 1,000 LF – Storm Pipe
  • 4 EA – Type M Inlets
  • 2 EA – Storm Manholes
  • 1,080 LF – 12” X 12” Cement Concrete Curb
  • 1,120 LF – 12” Perforated Sideline Drains
  • 1,120 LF – 6” Perforated Underdrain
  • 1,577 LF – Vinyl Coated Fence
  • 20,225 SY – 4 OZ Geotextile
  • 20,225 SY – 8” 2 Layer Synthetic Turf Drainage Base
  • 182,015 SF – Laser Grade Finish Stone
  • 3,900 SY – Lawn Restoration

 

 