Construction of a new multi-Purpose athletic facility with synthetic turf.
- 1,360 LF – Compost Filter Sock
- 3,880 CY – Topsoil Removal
- 16,300 CY – Bulk Excavation
- 1,100 SF – Segmental Retaining Wall
- 1,890 CY – Excavation for underground SWM System
- 1,890 CY – OGA Backfill (AASHTO #57)
- 1,000 LF – Storm Pipe
- 4 EA – Type M Inlets
- 2 EA – Storm Manholes
- 1,080 LF – 12” X 12” Cement Concrete Curb
- 1,120 LF – 12” Perforated Sideline Drains
- 1,120 LF – 6” Perforated Underdrain
- 1,577 LF – Vinyl Coated Fence
- 20,225 SY – 4 OZ Geotextile
- 20,225 SY – 8” 2 Layer Synthetic Turf Drainage Base
- 182,015 SF – Laser Grade Finish Stone
- 3,900 SY – Lawn Restoration