Project consisted of the transformation of a grass baseball and softball field to a reconstructed complete synthetic turf field.
BASEBALL FIELD
- 790 LF – 18” Filter Sock
- 2,145 CY – Topsoil Removal
- 1,730 CY – Cut to Fill Subgrade
- 1,214 LF – Storm Pipe
- 3,222 CY – Excavation for Underground SWM System
- 3,222 CY – OGA Backfill (AASHTO #57)
- 1,133 LF – Various Sizes of Cement Concrete Turf Curb
- 12,208 SY – 4 OZ Geotextile
- 2,628 CY – 2 Layer Synthetic Turf Drainage Base
- 109,876 SF – Laser Grade Finish Stone
- 2,537 LF – Vinyl Coated Fence
- 1 EA – 30-Foot-High Tension Net Backstop System
- 70 LF – 15-Foot-High Spectator Protection System
SOFTBALL FIELD
- 795 LF – 18” Filter Sock
- 1,394 CY – Topsoil Removal
- 1,565 CY – Cut to Fill Subgrade
- 1,030 LF – Storm Pipe
- 1,133 LF – Various Sizes of Cement Concrete Turf Curb
- 5,098 SY – 4 OZ Geotextile
- 1,097 CY – 2 Layer Synthetic Turf Drainage Base
- 45,878 SF – Laser Grade Finish Stone
- 700 LF – Vinyl Coated Fence