Elkins High School

ELKINS HIGH SCHOOL ELKINS, WEST VIRGINIA

Total reconstruction of the existing stadium to include new synthetic turf and running track.

  • 1,550 LF – Compost Filter Sock
  • 5,554 SY – Remove Track Surface
  • 5,554 SY – Mill Track Surface
  • 2,317 CY – Topsoil Removal
  • 1,723 CY – Bulk Excavation
  • 890 CY – Excavation for Underground SWM System
  • 890 CY – OGA Backfill (AASHTO #57)
  • 1,591 LF – 8” X 12” Cement Concrete Turf Curb
  • 1 Pair – Football Goal Post
  • 937 LF – Storm Pipe
  • 670 LF – 4” Perforated Field Drain
  • 626 LF – 8” Perforated Field Drain
  • 10,507 SY – 4 OZ Geotextile
  • 2,346 CY – 2 Layer Synthetic Turf Drainage Base
  • 94,566 SF – Laser Grade Finish Stone
  • 523 SY – D Area Asphalt Pavement
  • 5,165 SY – 3.5” Binder, 1.5” Wearing Course
  • 12,700 SF – Seed & Mulch Disturbed Areas

 

 