Bedford Area School District High School
Bedford, PA
The Bedford Area School District is receiving renovations to their high school, which includes the new installation of all utilities, dirt work, and brand-new football field.
2,300′ – Compost Filter Sock
14,725 CY – Bulk Cut
610′ – Gas Line Excavation & Backfill
460′ – Sanitary Sewer
550′ – Waterline
6,100′ – Storm Drainage Pipe
34 EA – 2×4 Inlets
3 EA – Endwalls
5 EA – Storm Manholes
1,435′ – 8×15 Concrete Curb
1,251 CY – #57 Synthetic Turf Drainage
14,700 CY – Retaining Wall Excavation




