The North Star Elementary School is receiving renovations to construct a new gymnasium which includes the installation of all utilities and dirt work. 1,595′ – Compost Filter Sock3,115 CY – Strip Topsoil8,772 CY – Excavation to Fill575′ – Gasline Excavation & Backfill683′ – Sanitary Sewer 6 EA – Sanitary Sewer Manhole420′ – Waterline 2,489′ – Storm Drainage Pipe9 EA – Storm Inlets4 EA – Storm Manholes558′ 6×18 Concrete Curb