Gautier Steel Improvements

GAUTIER STEEL MULTIMODAL SAFETY IMPROVEMENTS JOHNSTOWN, PA.

Total removal of an existing 1,000 LF long brick site wall and replacement with a precast segmental free-standing wall.

  • 1 LS – Demolition of existing Wall
  • 560 LF – 15” Storm Pipe
  • 4 EA – Type M Inlets
  • 1,920 LF – 3” Electrical Conduit
  • 54 EA – Electrical Boxes
  • 1,850 LF – 4” PVC Pipe
  • 7,900 EA – Patriot Wall Block
  • 460 EA – Universal Caps

 

Related Posts