Total reconstruction of the Chuck Schofield Memorial Stadium to include new synthetic turf and running track.
- 500 LF – Compost Filter Sock
- 4,360 SY – Remove Track Surface
- 4,360 SY – Mill Track Surface
- 1,300 LF – Remove Trench Drain
- 1,865 CY – Topsoil Removal
- 3,000 CY – Bulk Excavation
- 2,275 LF – 8” X 18” Cement Concrete Curb
- 1 Pair – Football Goal Post
- 1,260 LF – Vinyl Coated Fence
- 1,299 LF – Storm Pipe
- 775 LF – 4” Perforated Field Drain
- 520 LF – ACO Trench Drain
- 80,184 SF – 4 OZ Geotextile
- 1,485 CY – 2 Layer Synthetic Turf Drainage Base
- 85,579 SF – Laser Grade Finish Stone
- 2,255 SY – D Area Asphalt Pavement
- 5,110 SY – 1.5” Asphalt Pavement Overlay
- 23,450 SF – Seed & Mulch Disturbed Areas